Signed zero

Results: 37



#Item
21Covariance and correlation / Autocorrelation / Regression analysis / Range of a projectile / Expected value / Signed zero / Statistics / Time series analysis / Signal processing

A note on OCN Processing: The Retention of Negative Residual Lag-1 Autocorrelations Anthony Arguez NOAA’s National Climatic Data Center April 3, 2009

Add to Reading List

Source URL: www1.ncdc.noaa.gov

Language: English - Date: 2009-11-30 14:48:10
22ERRATA SHEET OASIS-C Version 2.00 Data Specifications, R3 Release Date: [removed]This document is intended to communicate minimal changes to the OASIS-C Version 2.00 Data Specifications since the posting of Revision 3.

ERRATA SHEET OASIS-C Version 2.00 Data Specifications, R3 Release Date: [removed]This document is intended to communicate minimal changes to the OASIS-C Version 2.00 Data Specifications since the posting of Revision 3.

Add to Reading List

Source URL: cms.gov

Language: English - Date: 2013-08-07 14:49:34
23Environmental Performance Label  Background • EP Label is the result of Assembly Bill[removed]Nation) signed into law in 2005 • Required on all new cars manufactured after

Environmental Performance Label Background • EP Label is the result of Assembly Bill[removed]Nation) signed into law in 2005 • Required on all new cars manufactured after

Add to Reading List

Source URL: www.arb.ca.gov

Language: English - Date: 2010-03-03 12:29:36
24Environmental Performance Label  Background • EP Label is the result of Assembly Bill[removed]Nation) signed into law in 2005 • Required on all new cars manufactured after

Environmental Performance Label Background • EP Label is the result of Assembly Bill[removed]Nation) signed into law in 2005 • Required on all new cars manufactured after

Add to Reading List

Source URL: arb.ca.gov

Language: English - Date: 2010-03-03 12:29:36
25DRAFT – June 5, 2014 – DRAFT For Public Review and Comment VERMONT ZEV ACTION PLAN INTRODUCTION On October 24, 2013, Governor Peter Shumlin signed a Zero Emission Vehicle (ZEV)

DRAFT – June 5, 2014 – DRAFT For Public Review and Comment VERMONT ZEV ACTION PLAN INTRODUCTION On October 24, 2013, Governor Peter Shumlin signed a Zero Emission Vehicle (ZEV)

Add to Reading List

Source URL: www.anr.state.vt.us

Language: English - Date: 2014-06-05 13:37:29
26Designing Language Support for IEEE 754

Designing Language Support for IEEE 754

Add to Reading List

Source URL: grouper.ieee.org

Language: English - Date: 2009-10-31 14:40:40
27NEWS RELEASE For Immediate Release Raleigh solar power plant will be first of its kind in N.C. RALEIGH, N.C. (July 7, 2009) – Progress Energy Carolinas has signed an agreement with NxGen Power to build, own and operate

NEWS RELEASE For Immediate Release Raleigh solar power plant will be first of its kind in N.C. RALEIGH, N.C. (July 7, 2009) – Progress Energy Carolinas has signed an agreement with NxGen Power to build, own and operate

Add to Reading List

Source URL: www.nxgenpower.com

Language: English - Date: 2011-11-15 12:50:04
28The pitfalls of verifying floating-point computations David Monniaux

The pitfalls of verifying floating-point computations David Monniaux

Add to Reading List

Source URL: hal.archives-ouvertes.fr

Language: English - Date: 2008-05-22 05:34:25
29Microsoft PowerPoint - ZEI_03numericka_reprezentacija.ppt

Microsoft PowerPoint - ZEI_03numericka_reprezentacija.ppt

Add to Reading List

Source URL: www.riteh.uniri.hr

Language: Croatian - Date: 2011-04-07 09:34:26
30Fast Inverse Square Root (Revisited) David Eberly Geometric Tools, LLC

Fast Inverse Square Root (Revisited) David Eberly Geometric Tools, LLC

Add to Reading List

Source URL: geometrictools.com

Language: English - Date: 2013-07-28 15:18:52